1. Pre-installation PreparationsConfirm bathroom dimensions, inspect floor and wall flatness, and prepare tools (level, screwdriver, etc.) along with materials like sealant and expansion screws to lay the foundation for subsequent installation.
2. Base Installation
Place the base and calibrate with a level, ensuring an error ≤2mm; apply sealant around the edges to prevent water seepage.
3. Side and Back Panel Installation
Assemble side and back panels by number, calibrate verticality with a level, fill joints with sealant, and avoid over-tightening screws to prevent panel deformation.
4. Glass Door Installation
Gently lift the glass door to fix hinges, adjust for smooth opening/closing, and ensure the seal strip fits tightly when closed.
5. Top Frame Installation
Fix the top frame and bolt it to the side panels, seal gaps to enhance structural stability and waterproofing.
6. Fittings Installation
Install fixtures like showerheads and faucets according to the manual, test water pressure at pipe connections to ensure no leakage.
7. Post-installation InspectionComprehensively check cabinet stability, joint tightness, and fitting functions, debug the drainage system to guarantee safe use.
COYONOW (COZY International Department) specializes in undertaking domestic and foreign prefab bathroom unit, prefab kitchen unit, shower wall panels renovation projects, please contact us to request a free consultation or download technical specs, and we can transform your next project with Prefabricated Bathroom pods.